Bridge ES301 concrete repair
Concrete Repairs A40 Acton Bridges, Bridge ES301, London Client: London Underground Limited Contract Duration: 32 weeks Bridge ES301 supports the A40 (Western Avenue) through Acton where it crosses the Central Underground Line. The bridge required refurbishment as it was showing severe signs of distress caused by inherent low cover and chlorides leaking through a poorly …