Foreva

Epoxy Resin Crack Injection Wimbledon Depot

Epoxy Resin Crack Injection Wimbledon Train Maintenance Depot Client: Stagecoach South Western Trains Contractor: Geoffrey Osborne Ltd Engineer: Frankham Consultancy Group Works Commenced: July 2017 Wimbledon Train Maintenance Depot services the train fleet for South West Trains. The facility was built in the early 20th Century with mass concrete walls, which were repaired in the …

Epoxy Resin Crack Injection Wimbledon Depot Read More »

Grovelands Car Park Concrete Repair & Waterproofing

Concrete repairs, Waterproofing and Brickwork repair Grovelands Shopping Centre Car Park, Oxfordshire Client: The Mid Counties Co-operative Ltd Designer: Pennycuick Collins Works Commenced: March 2018 Works Completed: June 2018 Damage to concrete was observed on the underside of a suspended car park roof slab at Grovelands Shopping Centre in Oxfordshire. The car park was built …

Grovelands Car Park Concrete Repair & Waterproofing Read More »

Wolverhampton University Concrete Column Damage Repair

Structural Concrete Repair Wolverhampton University Fire Damaged Column Repair Client: Wolverhampton University Contract Duration: 8 days A fire within the Arts Department of Wolverhampton University had caused structural spalling damage and cracking to a reinforced concrete support column. Quick mobilisation was required to carry out the works with minimal disruption, so the Department could re-open …

Wolverhampton University Concrete Column Damage Repair Read More »

Queen Marys Gate Carbon Fibre Strengthening

Carbon Fibre Strengthening Queen Mary’s Gate, London Client: Telford Homes Engineer: White Young Green Frame: Contractor Atlantic Contract Duration: 1 week Queen Mary’s Gate was a multi-phase residential development by Telford Homes, consisting of a cluster of 16 blocks of flats constructed on South Woodford High Road in London. The last phase of construction included …

Queen Marys Gate Carbon Fibre Strengthening Read More »

External Refurbishment Poplar

External Refurbishment Poplar Court, Leeds Client: Leeds City Council Contract Duration: 36 weeks Leeds City Council commissioned a major refurbishment scheme of four 14 floor blocks of flats in the Poplar area of Leeds. The extensive external refurbishment included: External concrete repairs Application of protective coatings Roof insulation Asphaltic coatings Cavity insulation Repairs to bin …

External Refurbishment Poplar Read More »

Connaught Tunnel Waterstopping and Control of Water Ingress

Waterstopping and Control of Water Ingress Connaught Tunnel, Crossrail Client: Crossrail Principal Contractor: Bachy Soletanche (Phase 1) Vinci Construction (Phase 2) Works Commenced: January 2013 (Phase 1) May 2014 (Phase 2) Works Completed: February 2013 (Phase 1) October 2014 (Phase 2) Phase 1 Appointed by the Client to carry out PU resin injection to 2no. …

Connaught Tunnel Waterstopping and Control of Water Ingress Read More »

Bridge ES301 concrete repair

Concrete Repairs A40 Acton Bridges, Bridge ES301, London Client: London Underground Limited Contract Duration: 32 weeks Bridge ES301 supports the A40 (Western Avenue) through Acton where it crosses the Central Underground Line. The bridge required refurbishment as it was showing severe signs of distress caused by inherent low cover and chlorides leaking through a poorly …

Bridge ES301 concrete repair Read More »